Technical guides

Epoxy Floor Coating System: Primer, Mortar, Putty and Topcoat

An epoxy floor is a multi-layer system. The primer seals the concrete, the mortar provides strength and level, the putty closes pores, and the topcoat creates the finished surface. Skipping a layer usually creates a visible or performance problem later.

Typical system

A standard build-up is prepared concrete, penetrating epoxy primer, epoxy mortar, epoxy putty and a self-levelling epoxy topcoat. Each layer must cure within the product's open time before the next is applied.

Substrate and moisture

Concrete should be sound, dry and free from laitance, oil and loose material. Check moisture and surface strength before application. Mechanical preparation is normally required for reliable adhesion.

  • Sound, clean concrete
  • Controlled moisture
  • Mechanical surface preparation
  • Correct primer and cure time

Specification for the use case

Define traffic, chemical exposure, impact, slip resistance and cleaning requirements. These determine the coating thickness, topcoat type and surface profile, not just the colour.

Questions and answers

Can epoxy be applied over new concrete?

Only after the concrete has cured sufficiently and moisture is within the product limit.

How long before the floor can be used?

It depends on the system and temperature; follow the product's curing schedule.

Does epoxy resist all chemicals?

No. Chemical resistance depends on the specific product and concentration; confirm the exposure with technical data.